Causeway Underbridge

Description

This 16 metre U deck underbridge was fabricated and finished with an NR type N4 paint system at our works. The permanent concrete works were then fitted/cast onto the structure at our in-house bridge manufacturing facility before being delivered to site.

Location

Hayle

Dimensions

16.65m x 3.8m

Weight

50t (99t lift including permenant concrete works)

Client

Balfour Beatty Rail

Materials

Similar Projects

Coming soon