Tovil Footbridge

Description

15 metre LM Span together with 27 No approach ramps, 4 flights of stairs and over 30 support trestles. All bridge components fabricated, blasted, painted, decked, delivered and installed by Nusteel’s experienced in-house departments.

Location

Tovil, near Maidstone, Kent

Dimensions

Main span of 15 metres, 192 metres of ramping sections and 16 metres of stair structures.

Weight

Overall steel weight – 194te.

Client

Costain Rail Limited

Materials

The main hollow steel sections are hot rolled to BS EN 10210:2006 S355J2H with the plates and sections to BS EN 10025:2004 S355J2+N. A Network Rail specification N1 type paint system was used in conjunction with a combined waterproofing and anti-slip decking system.